Applies to: S5

Checking the scope of delivery

The installation steps up to operation are:

  • Unpack the machine and ensure that you have received the following items:

Machine, cables, hoses

1 

2 

3 

4 

5 

Dental tools

6 

 

 

Tools

7 

8 

9 

Maintenance tools

10 

11 

12 

13 

14 

15 

Spare parts

16 

  1. 1 x Machine S5 

  2. 1 x USB cable

  3. 1 x Power cable

  4. 1 x Pneumatic hose

  5. 1 x Compressed air regulator


  6. 1 x QuickFrame


  7. 1 x Key for the emergency release of the working chamber door

  8. 1 x Torx screwdriver (TX 10)

  9. 1 x Hexagon screwdriver (2.5 mm)


  10. 1 x Spindle service set

  11. 1 x Calibration set:

    • 1 x Micrometer

    • 3 x Calibration blank

    • 1 x Radius cutter with 1 tooth (P200-R1-40)

  12. 1 x Crevice nozzle (for cleaning the working chamber)

  13. 1 x Hose connection for the external air extraction unit
  14. 1 x Measuring pin

  15. 1 x Drill bit for tool positions (2.8 mm)


  16. 2 x Tool magazine insert


Not shown:

  • 1 x Brief machine information
  • 1 x Carrying aid for transporting the machine
  • 1 x Transport lock in the working chamber
  • 1 x Supplement about removing the carrying aid and transport lock
  • 2 x Accessory kit in the working chamber
  • 2 x Spare screw for the tool magazine
  • 1 x Set of spare screws for the blank holder and the tool magazine cover
  • Transport lock

    • 1 x Transport box

    • 1 x Transport protection cover

    • 1 x Housing protection cover

Unpacking and positioning of the machine

  • Keep the packaging of the machine, the carrying aid and the transport lock for future transports.