Applies to: E4

Checking the scope of delivery

The installation steps to operation are:

  • Unpack the machine and ensure that you have received the following items:

Machine and cables

1 

2 

3 

4 

5 

 

Tools

6 

7 

8 

9 

10 

11 

Maintenance tools

12 

13 

14 

15 

16 

17 

18 

19 

20 

 

 

Spare parts

21 

22 

23 

24 

25 

26 

  1. 1 x Machine E4

  2. 1 x Cooling liquid tank

  3. 1 x Drain insert


  4. 1 x Ethernet network cable

  5. 1 x Power cable


  6. 1 x Torque screwdriver 1.5 Nm

  7. 1 x TX10 bit

  8. 1 x TX20 bit


  9. 2 x Angle screwdriver

    • 1 x TX10

    • 1 x TX20

  10. 1 x 10 mm wrench

  11. 1 x 5.5 mm wrench to remove a broken tool


  12. 1 x Spindle service set

  13. 1 x Calibration set:

    • 1 x Micrometer

    • 5 x Calibration blank

    • 1 x AirTool P250-F1-40-T

    • 1 x P200-R1-40-T (starting April 2024)

  14. 1 x Small cleaning brush for the blank holder


  15. 1 x Microfiber cloth

  16. 1 x Drill bit for tool positions (2.8 mm)

  17. 1 x Interdental brush for cleaning the nozzle plate


  18. 3 x Bags of Tec Powder for cleaning the cooling liquid system (50 g per bag)

  19. 1 x M4 cylinder screw for loosening a stuck tool magazine

  20. 1 x Cleaning brush for cleaning the cooling liquid tank


  21. 2 x Insert for the AirTool

  22. 2 x Tool magazine insert

  23. 2 x Grub screw (M5 x 10) for the blank holder


  24. 1 x Cover cap for the tool magazine

  25. 1 x Fine filter mat for the cooling liquid tank

  26. 4 x Fixing latches for the side panel


Not depicted:

  • 1 x Supplement for unpacking and installing the machine

  • 1 x General safety instructions

  • Transport lock

    • 2 x Foam insert

    • 1 x Plastic dowel

    • 2 x Accessory box

  • Packing set

    • 1 x Transport carton including floor insert

    • 1 x Upper and lower padding

    • 1 x Support pad

    • 1 x Transport protection cover

    • 1 x Housing protection cover