Applies to: S5

Maintenance table

If your machine is used for wet machining, this requires additional maintenance that is not listed in this table. The maintenance tasks are described in the operating instructions for the vhf wet grinding module.

The operating instructions are delivered with the vhf wet grinding module. They are also available for download here.

Several times per day

Action Recommended interval / Terms Procedure / Tools

Check the external pneumatic hoses for damage

Before switching on the machine

Visual check

Check the suction hose for damage

Before switching on the machine

Visual check

Once per day

Action Recommended interval / Terms Procedure / Tools

Performing the daily cleaning

  • After work

  • If soiled

Performing the daily cleaning

Checking the compressed air regulator

  • Before work

Checking the compressed air regulator

Once per week

Action Recommended interval / Terms Procedure / Tools

Cleaning the collet chuck

  • Once per week

  • 20 operating hours

Cleaning or exchanging the collet chuck of the spindle

Performing the weekly cleaning

  • Once per week

  • 20 operating hours

Performing the weekly cleaning

When necessary

Action Recommended interval Procedure / Tools

Updating the software and firmware

When an update is available

Updating the software and firmware

Cleaning the housing

If soiled

Cleaning the housing

Exchanging the main fuse

If defective

Exchanging the main fuse