Checking the scope of delivery
The installation steps up to operation are:
-
Unpack the machine and ensure that you have received the following items:
Machine, cables, hoses
Cooling liquid accessories
Maintenance tools and spare parts
-
1 x Wet grinding module
-
1 x Control cable for the cooling liquid pump
-
1 x IEC cable
-
1 x Standard power supply unit, alternatively: Power supply unit RCD wet grinding module
-
1 x Connecting hose
-
1 x Cooling liquid hose
-
1 x Tec Liquid Pro (1 l)
-
1 x Container with pH test strips
-
1 x Installation wrench for filter change
-
3 x Coarse filter mat
-
3 x Fine filter cartridges
-
1 x Castor set
-
3 x Front cover seal
Not shown:
-
1 x Brief machine information
-
1 x Software extension quick reference guide
-
1 x Cleaning brush
-
2 x Interdental brush
-
1 x Measuring cup
-
3 x Sealing rings
-
1 x Hexagon screwdriver (1.5 mm)