Applies to: N4+

Checking the scope of delivery

The installation steps up to operation are:

  • Unpack the machine and ensure that you have received the following items:

Machine, cables, hoses

1 

2 

3 

4 

5 

Tools

6 

7 

Maintenance tools

8 

9 

10 

11 

12 

13 

14 

Spare parts

15 

16 

17 

  1. 1 x Machine N4+

  2. 1 x Ethernet network cable

  3. 1 x Power cable

  4. 1 x Pneumatic hose

  5. 1 x Compressed air regulator


  6. 1 x Torque wrench (1.8 Nm), with hexagon bit (2.5 mm) and Torx bit (TX 10)

  7. 2 x Key for the emergency release of the working chamber door


  8. 1 x Spindle service set

  9. 1 x Calibration set:

    • 1 x Micrometer

    • 4 x Calibration blank

    • 2 x Fixing pins with screws

    • 1 x Radius cutter with 2 teeth (P200-R1-35)

  10. 1 x Cleaning brush

  11. 1 x Interdental brush (for cleaning the nozzle plate)

  12. 1 x Container with pH test strips

  13. 1 x Drill bit for tool positions (2.8 mm)

  14. 1 x Measuring pin


  15. 1 x Tank with activated carbon

  16. 3 x Fine filter

  17. 2 x Tool magazine insert


Not shown:

  • 1 x Brief machine information
  • 1 x Transport lock in the working chamber
  • 1 x Supplement about removing the transport lock
  • 2 x Accessory kit in the working chamber
  • 1 x Bottle of cooling lubricant Tec Liquid Pro (1 l)
  • 1 x Measuring cup (250 ml)
  • 3 x Spare screw for the blank holder
  • 3 x Bag with Tec Powder for cleaning the cooling liquid system (50 g per bag)
  • Transport lock

    • 1 x Transport box

    • 1 x Transport protection cover

    • 1 x Housing protection cover

Unpacking and positioning