Applies to: K5

Installing the machine

In which order do I have to install the components of the K5?

Checking the scope of delivery

  • Unpack the machine and ensure that you have received the following items:

See the images

  1. 1 x Machine K5
  2. 1 x Spindle service set
  3. 1 x Power cable
  4. 1 x USB cable
  5. 1 x Key for the emergency release of the working chamber door
  6. 1 x Pneumatic hose
  7. 1 x Administrated tool board (ATB) in the accessories container
  8. 1 x Torque screwdriver (1.5 Nm) in the accessories container
  9. 1 x Crevice nozzle (for cleaning the working chamber)
  10. 1 x Compressed air regulator
  11. 1 x Calibration set: 1 micrometer, 3 blanks for manufacturing test and calibration specimens, 1 radius cutter with 2 teeth (P200-R2-40)
  12. 1 x Measuring pin
  13. 2 x Tool magazine inserts
  14. 1 x Drill bit (2.8 mm) for tool positions

Not shown:

  • 1 x Brief machine information
  • 1 x Carrying aid for transporting the machine
  • 1 x Transport lock in the working chamber
  • 1 x Supplement about removing the transport lock
  • 1 x Supplement about removing the carrying aid and transport lock
  • 2 x Accessory kit in the working chamber
  • 4 x Spare screw for the blank holder
  • 4 x Spare screw for the tool magazine cover
  • Transport lock

    • 1 x Transport box

    • 1 x Top and bottom cushion

    • 1 x Transport protection cover

    • 1 x Housing protection cover

  • Packing set

    • 1 x Transport box

    • 1 x Top and bottom cushion

    • 1 x Transport protection cover

    • 1 x Housing protection cover

  • Keep the packaging of the machine, the carrying aid and the transport lock for future transports.